AMP (Alternative Maritime Power) / Cold Ironing.
Turn-key shore power solutions.
OPS (AMP) installations, both Retrofit and NB, are intensely increasing due to below indicative enablers:
- OPS is Mandatory for Container and Passenger vessels under FuelEU, from 2030 onwards.
- FuelEU benefits, started 01 January 2025, are already resulting in a very short ROI due to significant reduction on GHGIE actual (gCO2e/MJ)
- California (USA) CARB “2020 At Berth Regulation”
- OPS (AMP) gains are significantly increased due to IMO GFI (GHG fuel intensity) under MEPC 83 Regulations (practically applying Jan 2028 onwards).
- Improving CII
- Reducing EU ETS (EUAs)
- Fuel Saving
ADD Marine undertakes along with its partners:
- Thorough techno-economic analysis and case study/ROI calculation based on specific vessel’s data (operational pattern, port calls, ELA, etc), including derived benefits for applicable regulations (FuelEU, EU ETS, IMO GFI (GHG fuel intensity) under MEPC 83, CII and Fuel/Energy Savings)
- Proposal of optimum scope of supply (e.g system size and equipment) and installation locations (e.g containerized solution, either fixed or mobile type, or open deck installation, Cable Reels, socket boxes, HVSC SB, Transformer, LV or HV Receiving Panel, etc)
- Turn Key installation either during DD or afloat (including Engineering and owners’ supply items)
- Commissioning
- After Sales support
See the Letter Of Authorization here:
Letter of Authorization – Jiangsu Jianlong Electrical Co., Ltd
Indicative Schematics / Installation Options (vessel specific)




Contact Form
Get in Touch
Contact us via phone, email, or by filling out the form, and we’ll get back to you as soon as possible.
A: 106, Kyprou Ave, Argyroupoli,
16452, Athens, Greece
E: tech@addmarine.gr
Tel: +30 210 9953760
Dimitris Koliaroudakis
M: +30 6974079200
E: koliaroudakis@addmarine.gr
Andreas Angelidis
M: +30 6982243252
E: angelidis@addmarine.gr
© 2025 ADD Marine. All Rights Reserved.